Go top
Project information

Study on the feasibility of different electric generation scenarios in the mid term in Spain

P. Frías P. Linares J.P. Chaves F.M. Echavarren C. Mateo F. Postigo Marcos

December 2016 - July 2017

Funding entity Greenpeace España


The objective of the study is the analysis of the technical feasibility of different electric generation scenarios in the medium term in Spain, associated with the progressive withdrawal of coal and nuclear power plants.


Greenpeace_Escenarios